⛽️The Foreman Lag gas field contains over 300 billion cubic meters of gas, enough to supply the UK's gas needs for 40 years.
🛢️The UK is increasingly relying on natural gas to power its economy, as coal is no longer sustainable.
💰The project will cost $10 billion and take 10 years to complete, with the potential to bring significant economic benefits to both Norway and the UK.
🔌The gas platform will be powered by a 125-kilometer control cable, which will also provide communication and hydraulic capabilities.
🌊The engineers face challenges such as drilling through the seabed, trenching the rough sea floor, and adapting the system to handle the unique properties of the Ormen Lange gas.