The Ultimate Driveway Transformation: Cleaning, Crack Filling, and Steel Coating

TLDRWatch the amazing transformation of an 18,000 square feet driveway as it goes through professional cleaning, crack filling, and steel coating. Get an aerial view of the project and see the before and after shots of the rough surface. Learn about the crack filling process and the importance of sealing the pavement. Follow the two-man team as they work together to efficiently apply the steel coating, ensuring complete coverage of the entire driveway.

Key insights

🏞️Experience the process of cleaning, crack filling, and steel coating an 18,000 square feet driveway.

🚜Witness the use of specialized equipment, including a rotating moss buster and crack filling machine.

💪Observe the teamwork and coordination between the crew members to get the job done efficiently.

🔍Learn the importance of crack filling to prevent further damage and extend the life of the pavement.

🌈See the stunning visual transformation of the driveway before and after the steel coating application.

Q&A

Why is crack filling necessary for a driveway?

Crack filling helps seal out water and prevents further damage caused by freeze-thaw cycles and expanding/contracting asphalt.

What equipment is used for cleaning the driveway?

A rotating moss buster with metal bristles is used to clean the surface, along with a ground blower to remove debris.

How long does it take to steel coat an 18,000 square feet driveway?

The time required depends on various factors such as the condition of the driveway and the crew size. It can range from several hours to a full day.

What is the purpose of the HD (heavy-duty) material used in the steel coating?

The HD material contains more aggregate, making the coating thicker and more durable, providing better protection against UV, oils, and water.

Can crack filling and steel coating be done by DIYers?

While it is possible for DIYers to attempt these processes, it is recommended to hire professionals for optimal results and to ensure proper application.

Timestamped Summary

00:00Introduction and gratitude to the viewers for their support and subscription.

00:36Overview of the project: an 18,000 square feet driveway in need of cleaning, crack filling, and steel coating.

01:30Cleaning process using a rotating moss buster and ground blower. Importance of thorough cleaning for optimal results.

03:34Crack filling process and its significance in extending the life of the pavement and preventing further damage.

06:58Steel coating application begins, showcasing the two-man team's coordination and efficiency.

10:32Aerial view of the steel coating progress and the visual transformation of the driveway.