🔌The installation process involves uncovering manholes, tying into duck banks, and pulling fiber into the building.
🏭The purpose of this project is to get fiber through the warehouse and into the next one.
🧰Scissor lifts are used to access the ceiling, where the conduit is located.
🔧The fiber is hooked onto a pole rope before being pulled into the building.
🚧The installation involves navigating through different buildings and rooms.