The Dart Project: Disassembling the Engine for Inspection

TLDRJoin us as we disassemble the Dart's engine to inspect its components and determine its condition. We find good forged pistons and positive deck height, indicating good compression. The transmission is heavy but will be replaced with a 904. Once we have the necessary parts, we aim to have the engine running in one week.

Key insights

🔧The engine has good forged pistons and positive deck height, indicating good compression.

⚙️The transmission is heavy and will be replaced with a 904 for better performance.

🔩The engine components are clean and well-maintained, with no visible issues or damage.

🚗The goal is to have the engine running within one week, once all necessary parts are available.

The engine project requires careful inspection and cleaning, but progress is being made towards getting it up and running.

Q&A

What did you discover during the engine disassembly?

We found good forged pistons, positive deck height, and clean engine components with no visible issues or damage.

Why are you replacing the transmission?

The current transmission is heavy, so we are replacing it with a 904 for better performance.

How long do you expect it will take to get the engine running?

Once we have all the necessary parts, we aim to have the engine running within one week.

What is the goal for the Dart project?

The goal is to successfully rebuild and restore the Dart, improving its performance and overall condition.

What challenges have you faced so far?

We have faced challenges with finding the right parts and preparing the engine for assembly, but we are making progress.

Timestamped Summary

00:00We begin by disassembling the engine to inspect its components and determine its condition.

02:45We find good forged pistons and positive deck height, indicating good compression.

06:20The transmission is heavy and will be replaced with a 904 for better performance.

11:00The engine components are clean and well-maintained, with no visible issues or damage.

13:40Once we have all the necessary parts, we aim to have the engine running within one week.