PSLV C58 Exposat Mission: Unveiling the Mysteries of the Universe

TLDRThe PSLV C58 Exposat Mission, scheduled for January 1, 2024, aims to study x-ray polarization signatures from celestial sources. The mission will deploy the Exposat satellite, which includes the polarimeter instrument to measure polarimetry parameters in the x-ray energy range and the x-ray spectroscopy and timing instrument for fast timing and excellent spectrometric resolution. The launch sequence will involve the ignition of the first stage, separation of the strap-on motors, separation of the core stage, and operation of the second, third, and fourth stages. The mission represents a significant step in the exploration and understanding of celestial phenomena.

Key insights

🚀The PSLV C58 Exposat Mission aims to study x-ray polarization signatures from celestial sources.

🛰️The Exposat satellite includes the polarimeter instrument to measure polarimetry parameters in the x-ray energy range.

📡The x-ray spectroscopy and timing instrument provides fast timing and excellent spectrometric resolution in the soft x-ray energy range.

🌌The mission will unveil deeper insights into the manifestation of processes generating x-rays from celestial bodies.

📅The launch sequence involves the ignition and separation of various stages of the PSLV C58 rocket.

Q&A

What is the main objective of the PSLV C58 Exposat Mission?

The main objective is to study x-ray polarization signatures from celestial sources.

What instruments are included in the Exposat satellite?

The Exposat satellite includes the polarimeter instrument and the x-ray spectroscopy and timing instrument.

What key insights will the mission provide?

The mission will provide insights into the manifestation of processes generating x-rays from celestial bodies.

What is the launch sequence for the PSLV C58 rocket?

The launch sequence involves the ignition and separation of various stages of the rocket.

When is the launch scheduled for?

The launch is scheduled for January 1, 2024.

Timestamped Summary

09:49The countdown for the PSLV C58 Exposat Mission commenced 25 hours prior to the scheduled launch time.

14:22The launch sequence involves the ignition and separation of the first stage, strap-on motors, and core stage of the PSLV C58 rocket.

23:10The Exposat satellite includes the polarimeter instrument for studying x-ray polarization signatures and the x-ray spectroscopy and timing instrument for fast timing and spectrometric resolution.

27:04The PS1 stage ignites and separates, followed by the ignition of the second stage (PS2) and operation of the third (PS3) and fourth (PS4) stages.

28:38The PSLV C58 rocket lifts off, carrying India's x-ray polarimetric satellite (Exposat).