Perfecting Driveway Maintenance: Filling Cracks and Sealcoating

TLDRLearn how to effectively maintain your driveway by filling cracks and sealcoating. Watch as we tackle a 10,000 square feet project and provide pro tips along the way.

Key insights

🔑Filling cracks in your driveway is essential to prevent further damage and maintain its appearance.

🚧Trimming the edges and cleaning the driveway before sealing ensures proper adhesion and a smooth finish.

🔥Hot rubberized crack filler is the best material to use for filling cracks as it provides a durable and long-lasting solution.

🧹Using a power broom and blower helps clean the surface and prepare it for crack filling and sealcoating.

🖌️Applying a sealer to your driveway not only protects it from the elements but also enhances its appearance.

Q&A

Why is filling cracks important for driveway maintenance?

Filling cracks helps prevent further damage by preventing water from entering the cracks and causing them to expand. It also improves the appearance of the driveway.

What is the best material for filling cracks?

Hot rubberized crack filler is the best material for filling cracks as it provides a flexible and durable solution that can withstand temperature changes and traffic.

Why is trimming the edges and cleaning the driveway necessary before sealing?

Trimming the edges removes any overhanging grass or vegetation that can interfere with the sealing process. Cleaning ensures proper adhesion of the sealer and a smooth finish.

What tools are needed for driveway maintenance?

Tools such as a power broom, blower, crack filler, and a sealing tank are commonly used for driveway maintenance.

How often should I sealcoat my driveway?

It is recommended to sealcoat your driveway every 2-3 years to maintain its protective layer and prolong its lifespan.

Timestamped Summary

00:01Introduction to the project and location in East Brunswick, New Jersey.

00:13Overview of the tools and materials being used for the project.

00:26Explanation of the crack filling process and the importance of using hot rubberized crack filler.

01:00Demonstration of the power broom and blower for cleaning the driveway before crack filling.

02:25Progress update and overview of the project area.

07:00Completion of crack filling and preparation for sealcoating.

11:31Explanation of the importance of cooling the pavement before sealcoating.

12:11Final thoughts, customer satisfaction, and advice for planning a successful driveway maintenance project.