🌊The construction of Acrod Dam and Sea Wall utilizes a new generation of Acrod blocks for easier and faster installation.
⛏️The construction process involves collecting and sorting rocks and materials from the sea, as well as excavating the seabed.
🔗The Acrod blocks are anchored to the seabed using various techniques, ensuring their stability and integration into the overall structure.
⛰️Tetrapods, wave dissipating blocks, are produced using a multi-stage process to ensure durability and effective wave energy dissipation.
🏗️Casin structures, used for key walls in port facilities, are pre-fabricated on land and then transferred to their designated positions using airbags and careful maneuvering.