🏗️The construction process starts with setting up forms for the concrete slab.
🧱Concrete is poured in multiple stages, allowing for the addition of foam insulation and plumbing rough-ins.
🔨The walls are framed, and the team tackles challenges like setting up Gable ends and ridge poles.
🌿Soffits and fascia are installed, and sealing and staining are done to protect the wood.
🚪Doors are hung, and the finishing touches, such as foam insulation and siding, are added.